We built Ecozen because energy in Bharat often doesn’t work the way it’s supposed to when it’s needed most, and we decided to fix that ourselves.

On September 17, 2026, The Japan Times, distributed internationally as the exclusive Japan print partner of The New York Times International Edition, put that story on its pages. The headline said it plainly: “Where power is unreliable, Ecozen makes every unit count.”

This recognition matters. Japan didn’t earn its reputation for precision engineering by accident, and a publication built on that same standard chose to write about a company from Pune that started by trying to keep an irrigation pump running in a region the grid had not yet reached. We’re proud of that. We’re also aware of exactly how much distance there is between one feature and the scale of the problem we’re still solving.

Since 2010, we’ve refused to build technology just in a lab and hope it survives the field. We design backwards from the constraints our customers actually face, then we prove the design where those constraints are worst, on farms, in cold storage units, on rooftops, built for Indian energy conditions. That discipline is what the report credits us for, and it’s the only kind of engineering we believe in.

Ecozen co-founders from left to right: Prateek Singhal (COO), Vivek Pandey (CTO) & Devendra Gupta (CEO)

The number worth sitting with: 5.72 billion kilowatt-hours of clean energy delivered. Every one of those units ran through hardware and software we designed to work when nothing else did.

Here’s what we want to say plainly. We are not building Indian technology as a cheaper substitute for something engineered elsewhere. We are not retrofitting imported systems to fit Indian conditions. We are building decentralised energy infrastructure made for Bharat, from the ground up, for the constraints Bharat actually has. Urja ka saccha swaraj. Energy independence that is genuinely ours, not borrowed, not second-hand.

We know how far we still have to go. But a paper with Japan’s own engineering reputation choosing to write about this work tells us the direction is right, and that’s reason enough to keep pushing.

Read the full feature on The Japan Times: Where power is unreliable, Ecozen makes every unit count